Staff area

   Login
Marine
total: 92
Port
total: 128
Cranes
total: 165
Heavy Transport
total: 19
Shipyard
total: 58
Piling
total: 1
Dredgers
total: 6
Different
total: 13
Full list of wanted equipment.

Ref NoTypeBrandModelYearCapacitySpecsCommentsDetails
bg1142Trailer ModularGOLDHOFERTHP / PST / SL300T SWL per pieceFour (4) x 6-axle trailers (with 4 driven wheelsets in every trailer) THP/PST SL type Year - 2000 Width - 3m Two (2) x 2-axle trailers (not propelled) THP SL type Year - 2004 Width - 3m Four (4) power pack units Deutz engines - 95 kW Year - 2000 Working hours - 8750 hrs; 8732 hrs; 9200 hrs; 8347 hrsIncluding all necessary mechanical and hydraulic equipment for coupling in longitudinal and transversal direction, lights to drive on public road, seats and several spare parts.
ea1099Crane ContainerZPMCShip to Shore Super Post Panamax2010105tCapacities: - Single container under spreader – 50t - Twin 20’ container under spreader – 65t - Under ropes single hoist / cargo beam – 105t / 100t Outreach (spreader mode) – 65m Backreach – 25m Lifting height above rail – 41m Lifting height below rail – 17mFour (4) units
ad1358Crane TowerKROLL10,0001989240t240 tons @ 44m 120 tons @ 82mRail mounted Fully complete
ac2838Crane CrawlerKOBELCOSL 4500R2014450tWorking hours – 1523,4 hrs
eb1210Crane Mobile HarbourLIEBHERRLHM 6002010104tMin to Max outreach – 12-58m Height of boom fulcrum – 30,6m Tower cabin height – 37,1m Total weight of the crane – 580t Spreader – Bromma / EH5-U2 units Working hours: 1st crane – 20.161 hrs, 2nd crane – 19.307 hrs